Toho Water Authority has announced the upcoming closure to thru traffic at the Mendoza Dr./Ln and San Remo intersection will resume on Monday, April 12 at approximately 9 a.m. Traffic will be able to enter and exit Mendoza Ln. and driveways will remain accessible.
The closure is necessary to conduct additional repairs for a sewer rehabilitation project in the area.
The project is being carried out by Garney Construction at is expected to be completed by the evening of Friday, April 16. Schedules could vary according to weather and other unforeseen circumstances.
Motorists and pedestrians are urged to use caution when approaching these areas, as workers will be present and speed limits may be reduced and sidewalks possibly closed and diverted.
TEMPORARY INCONVENIENCES
· Noise and vibrations
· Barricades and fencing for safety
· Trucks, machinery, and equipment
· Possible odors from the sewer system
SAFETY
· If you see a potentially unsafe situation or equipment or fencing that requires attention, please contact Toho’s Customer Service Department immediately at 407-944-5000.
· Please keep children away from the construction site at all times to avoid accidents.
· If you become aware of a public safety emergency, please call 911 immediately.
FOR MORE INFORMATION
· Garney Construction: 941-815-3659
· Toho Water Authority: 407-944-5000
Please visit www.tohowater.com/projects for more project details and updates.